All articlesstrata inspection

Strata Common Property Inspection: A Practical Guide

Inspectra AI Team October 31, 2026 11 min read

A strata common property inspection is a structured assessment of all areas shared by lot owners within a strata scheme — including lobbies, stairwells, car parks, rooftops, and mechanical plant. Done properly, it gives the owners corporation a defensible record of condition, identifies maintenance liabilities before they escalate, and supports levy budgeting and insurance renewal.

Key takeaways

  • Common property boundaries must be established before the inspection — the registered strata plan defines what the owners corporation is responsible for maintaining.
  • In Australia, strata legislation in each state (e.g. NSW Strata Schemes Management Act 2015, VIC Owners Corporations Act 2006) imposes a duty to maintain common property in good repair.
  • A useful common property inspection covers structure, weatherproofing, services, safety systems, and accessibility across every shared element.
  • Defects should be graded by urgency (e.g. immediate safety risk, short-term maintenance, long-term capital works) to feed directly into the 10-year capital works fund plan.
  • Digital documentation — time-stamped photos, voice notes, and structured reports — significantly reduces disputes between lot owners and the owners corporation.

What Counts as Common Property in a Strata Scheme

Before any inspection begins, the inspector and strata manager must agree on the inspection scope. Common property (CP) is defined by the registered strata plan, but as a general rule it includes:

  • External walls, roofs, and foundations
  • Shared foyers, corridors, stairwells, and lifts
  • Car parks, driveways, and visitor parking areas
  • Gardens, pools, and recreational facilities
  • Building services running through common areas (fire systems, hydraulics, electrical risers, HVAC)
  • Balcony structural slabs (in most Australian jurisdictions the structural slab is CP even if the balcony space is a lot)

Lot owners are generally responsible for everything within their lot boundary — internal fitout, non-structural walls, and fixtures. If there is ambiguity (common in older buildings), obtain a strata search or legal advice before the inspection so findings are attributed correctly.


Applicable Standards and Legislation

Inspectors operating across different markets should be familiar with the following:

| Jurisdiction | Key instrument | Relevance | |---|---|---| | Australia (general) | AS 4349.1-2007 | Inspection of buildings — residential buildings | | NSW | Strata Schemes Management Act 2015 (s106) | Duty to maintain and repair CP | | VIC | Owners Corporations Act 2006 | Maintenance obligations and fund planning | | QLD | Body Corporate and Community Management Act 1997 | Maintenance plans and sinking funds | | UK | BS 7913:2013 | Guidance on maintenance of historic buildings (relevant for period conversions) | | US | InterNACHI SOP 2021 | Residential inspection standards of practice |

For strata-specific capital works fund planning in NSW, the SCA (Strata Community Association) recommends a 10-year plan reviewed at every AGM. In the UK, the equivalent is a Section 20 consultation process under the Landlord and Tenant Act 1985 for major works exceeding £250 per leaseholder.


Planning the Inspection

Define the Scope and Obtain Access

Contact the strata manager at least two weeks before the inspection to:

  1. Obtain a copy of the registered strata plan and confirm CP boundaries.
  2. Review the last inspection report and any outstanding maintenance orders.
  3. Arrange key or fob access to plant rooms, roof hatches, basement levels, and utility cupboards.
  4. Check whether any specialist sub-inspections are needed — thermographic scanning for moisture, lift inspection under AS 1735, or fire system inspection under AS 1851.

Without prior access arrangements, inspectors routinely miss plant rooms and roof spaces — two areas that generate the largest capital works items.

Review Existing Documentation

Before arriving on site, gather:

  • Previous inspection reports and defect registers
  • Any active building warranty or defect liability period documentation
  • Insurance certificate of currency (confirms sum insured and any exclusions)
  • Maintenance contracts (lifts, fire, HVAC) so you know what is being serviced externally
  • Council or building approval records for recent works

This background review takes 30–60 minutes but prevents duplicate effort and flags areas that need closer scrutiny.


Conducting the Inspection: Area by Area

Exterior Envelope

Start outside and work systematically around the building perimeter.

What to check:

  • Render, cladding, or brickwork: cracking, delamination, efflorescence, or water staining
  • Windows and glazing in common areas: failed seals, damaged frames, inadequate flashings
  • Roof covering: condition of tiles, membrane, or metal sheeting; condition of penetrations, ridge cappings, and flashings
  • Gutters and downpipes: blockages, corrosion, inadequate fall, or disconnected outlets
  • Balcony and terrace waterproofing: ponding water, cracked membranes, failed sealant at junctions

Measurable thresholds to note:

  • Structural cracks wider than 3 mm in masonry warrant further engineering assessment (AS 3700 guidance).
  • Flat roof membranes typically have a serviceable life of 15–25 years depending on product; note installation date if available.

Common Internal Areas

Foyers, corridors, and stairwells:

  • Floor finishes: trip hazards, damaged tiles, worn carpet on stairs
  • Wall and ceiling finishes: staining (evidence of leaks above), damaged plasterboard, peeling paint
  • Lighting: failed luminaires, inadequate lux levels for egress (AS 1680.2.1 recommends minimum 80 lux on stair treads)
  • Handrails and balustrades: compliance with NCC (National Construction Code) height requirements — 1,000 mm minimum for floors above ground level in Class 2 buildings

Lifts:

  • Note the date of the last statutory inspection (annual requirement in most states)
  • Check for visible damage to cab interior, door operation, and emergency phone function
  • Flag any compliance notices from the lift contractor

Car Parks and Driveways

  • Concrete slab condition: spalling, exposed reinforcement (a sign of carbonation or chloride-induced corrosion)
  • Line marking and signage: clarity, compliance with local traffic regulations
  • Drainage: floor grates clear, no pooling
  • Lighting: adequate for safety (minimum 50 lux recommended for car parks under AS 1680)
  • Fire rated doors and shutters: self-closing, latching correctly, no damage to seals

Mechanical, Electrical, and Hydraulic Services

These areas require the most documentation because they carry the highest capital replacement costs.

Electrical:

  • Age and condition of main switchboard and distribution boards serving common areas
  • Presence of RCDs (residual current devices) on lighting and power circuits — mandatory in new installations, but many older buildings lack them
  • Common area metering — confirm sub-metering is in place where required

Hydraulic:

  • Cold water storage tanks: condition, access, evidence of contamination
  • Hot water systems: age, pressure relief valve condition, signs of corrosion
  • Stormwater and sewer drainage serving CP: inspection openings clear, no root intrusion visible

HVAC:

  • Age and service history of common area air handling units and exhaust fans
  • Filter condition in any centralised systems
  • Car park ventilation: compliant with AS 1668.2 (mechanical ventilation in buildings)

Fire Safety Systems

Fire safety is a non-negotiable compliance area. Under the NCC and state fire regulations, owners corporations must maintain:

  • Smoke detectors and heat detectors in common areas
  • Sprinkler systems (where installed) in accordance with AS 2118.1
  • Hydrant and hose reel systems per AS 2419.1
  • Exit and emergency lighting tested to AS 2293.2 (minimum 90-minute duration)
  • Fire doors: self-closing, latching, intumescent seals intact

Record the date of the most recent annual essential safety measures (ESM) report — in Victoria this is a legal requirement; similar obligations exist under NSW EP&A regulations.


Grading and Prioritising Defects

A defect register without priority grading is almost useless for budget planning. Use a three-tier system:

| Priority | Criteria | Typical action timeframe | |---|---|---| | P1 — Immediate | Safety risk, active water ingress, non-compliant exit | Within 7 days | | P2 — Short-term | Deterioration likely to worsen, minor compliance gap | Within 6 months | | P3 — Long-term | Planned replacement, cosmetic, capital works item | 1–10 year capital plan |

This grading feeds directly into the strata committee's maintenance budget and 10-year capital works fund plan. In NSW, failure to maintain an adequate sinking (capital works) fund can expose committee members to personal liability under s238 of the Strata Schemes Management Act 2015.


Documenting Findings Effectively

Poor documentation is the single most common reason strata inspection reports are challenged. Follow these practices:

  1. Photograph every defect with a reference object for scale (a coin, tape measure, or hand). Time-stamped metadata is essential.
  2. Locate defects precisely — use grid references, level numbers, and compass orientation (e.g. "Level 3, north-facing external wall, 2 m east of stairwell door").
  3. Record observations, not diagnoses — note what you see ("75 mm horizontal crack in render at parapet junction") rather than cause ("structural failure") unless you are qualified to opine.
  4. Attach supporting documents — lift inspection certificates, fire maintenance logs, and ESM reports should be appended or referenced.
  5. Use a consistent format — reports that jump between narrative prose and bullet lists are harder for strata managers and committees to act on.

Platforms like Inspectra AI convert field photos, voice notes, and structured observations into formatted strata inspection reports, reducing report production time from several hours to under 30 minutes while maintaining the audit trail committees need.


After the Inspection: Reporting and Follow-Up

Delivering the Report

The report should be delivered within five business days of the inspection. At a minimum it should include:

  • Executive summary with overall condition rating
  • Defect register with priority grading, location, and photos
  • Recommended action plan with indicative cost ranges
  • Appendices: relevant certificates, referenced standards, and strata plan excerpts

Presenting to the Owners Corporation

If presenting to an AGM or strata committee meeting:

  • Lead with P1 items — committees are more likely to allocate emergency funds when safety risks are front and centre.
  • Provide cost ranges, not exact quotes — an inspection report is not a scope of works, and over-specifying costs creates liability.
  • Cross-reference findings with the existing capital works fund plan and flag any items that require the plan to be revised.

Frequently Asked Questions

How often should a strata common property inspection be carried out?

For most residential strata buildings, a comprehensive common property inspection every two to three years is standard practice. High-rise buildings, older buildings over 30 years, or those with known defects should be inspected annually. Statutory inspections (fire, lifts, essential safety measures) have their own mandatory annual cycles regardless of the general inspection schedule.

Who is qualified to conduct a strata common property inspection?

In Australia, building inspectors conducting formal reports should hold a relevant licence — in NSW this is a contractor licence or building consultancy licence under the Home Building Act 1989 for residential strata. For specialist systems (fire, lifts, electrical), sub-contractors with the relevant trade or specialist licence must be engaged. In the UK, RICS-qualified surveyors typically carry out common parts surveys for leasehold buildings.

What is the difference between a strata inspection and a capital works fund plan?

A strata inspection is a physical condition assessment; a capital works fund plan (called a sinking fund plan in some states) is a financial forecasting document. The inspection feeds into the plan by quantifying defects and estimating replacement timelines and costs. They are complementary — one without the other gives an incomplete picture.

Can a lot owner request a common property inspection?

Yes. In most Australian jurisdictions, a lot owner can submit a written request to the owners corporation requiring it to carry out necessary repairs and maintenance. If the owners corporation fails to act, the lot owner may have recourse through the relevant tribunal (NCAT in NSW, VCAT in VIC). A documented inspection report is often the evidence base for such applications.

How do I handle defects that fall on the boundary between lot and common property?

Boundary disputes are common, particularly with waterproofing to balconies, embedded pipes, and structural elements adjacent to lot fitout. The starting point is always the registered strata plan. Where ambiguity exists, some states have specific by-laws or legislation that deem certain elements to be CP (e.g. in NSW, s53 of the Strata Schemes Development Act 2015 addresses boundary disputes). Engage a strata lawyer or surveyor rather than making a determination in the inspection report.

How long does a common property inspection typically take?

For a small residential block of 10–20 lots, allow three to four hours on site. A large complex with multiple buildings, car parks, pools, and extensive services can take one to two full days. Report preparation adds a further two to six hours depending on the volume of defects and the documentation system used. Tools like Inspectra AI can significantly compress reporting time by structuring observations captured in the field.


Bottom line

A thorough strata common property inspection protects lot owners, supports the owners corporation's legal obligations, and produces the data needed for realistic capital works fund planning. The value of the inspection is only as good as the documentation behind it — precise defect locations, graded priorities, and photographic evidence are what turn a site visit into an actionable report.

If you want to spend less time writing and more time inspecting, start a free trial with Inspectra AI and see how AI-assisted reporting handles the documentation while you stay focused on the building.

Draft inspection reports in minutes

Inspectra AI turns your photos and field notes into client-ready reports — with human approval at every step.